Mixed-Use
Clarendon West is the phase 2 of the overall master development of the old Red Top Cab facilities. Phase 2 will consist of one below-grade parking level, with two residential towers above grade. The project will add a 12th street in between the Two towers. The project will have a small mixed-use area on the ground floor.
Owner
TCR
Architect
WDG